Bayswater Talisay required a solar energy solution to support its commercial facility operations while maintaining compliance with electrical and structural standards.
System Size48 kWp hybrid solar system
Solar Modules600–620W high-efficiency TOPCon bifacial panels
Inverter50 kW three-phase hybrid inverter
Battery Storage120 kWh high-voltage lithium battery system
Estimated Annual Generation~65,000–72,000 kWh
Operating Voltage400V three-phase
Commercial Solar Power System Deployment
The Challenge
- Consistent daytime energy demand
- Rising electricity costs
- Need for compliant, scalable infrastructure
The Solution
PCSC implemented a grid-tied commercial solar system, engineered to maximize rooftop capacity and optimize daytime energy offset.
Key Features
- High-efficiency solar modules
- Single/three-phase system configuration
- Grid-compliant installation
- Long-term performance design
Results
- Significant daytime grid offset
- Improved energy cost predictability
- Reduced long-term operational expenses
- Infrastructure prepared for future energy expansion