Proven Climate Resistance.
Projects / Bayswater Talisay

Bayswater Talisay

~35–45% reduction in grid electricity consumption
Talisay48 kWpCommercial

Bayswater Talisay required a solar energy solution to support its commercial facility operations while maintaining compliance with electrical and structural standards.

System Size48 kWp hybrid solar system
Solar Modules600–620W high-efficiency TOPCon bifacial panels
Inverter50 kW three-phase hybrid inverter
Battery Storage120 kWh high-voltage lithium battery system
Estimated Annual Generation~65,000–72,000 kWh
Operating Voltage400V three-phase

Commercial Solar Power System Deployment

The Challenge

  • Consistent daytime energy demand
  • Rising electricity costs
  • Need for compliant, scalable infrastructure

The Solution

PCSC implemented a grid-tied commercial solar system, engineered to maximize rooftop capacity and optimize daytime energy offset.

Key Features

  • High-efficiency solar modules
  • Single/three-phase system configuration
  • Grid-compliant installation
  • Long-term performance design

Results

  • Significant daytime grid offset
  • Improved energy cost predictability
  • Reduced long-term operational expenses
  • Infrastructure prepared for future energy expansion

Your Partners in Sustainable Infrastructure.

Talk to our specialists to assess your requirements and design a reliable, compliant solar solution built for long-term performance.

0917-707-4935
0977-877-0077
enquiry@philippineconstructionandsolarcorp.com
Book a Consultation Call

Our Address

Purok Mangga 2, Bajak,
Poblacion, Liloan, Cebu 6002
View in Google Map

Connect with us